1. <label id="k10uo"></label>
    2. <tt id="k10uo"></tt>
      日本一级午夜福利免费区,国产午夜精品亚洲精品国产,日韩一区二区三区在线观院,日本熟妇人妻一区二区三区,国产台湾黄色av一区二区,亚洲岛国成人免费av,噜妇插内射精品,四虎国产精品久久免费地址

      News

      Drilling of Hilong’s Comprehensive Technical Service Well Rajani-5 Starts

      Date 2016-03-23

      (March 23, 2016, Shanghai) Hilong Oil Service & Engineering Pakistan (Private) Ltd. successfully started an integrated service project to drill well Rajani-5 on March 21, 2016, with drilling fluid, directional drilling and bits services.
       

      The designed TD of Rajani-5 is over 14000ft, estimated bottom hole temperature(BHT) is as high as 170℃, the highest mud weight is as high as 14ppg. It is a rare deep and high-temperature well in Rajani block, giving extreme difficulty to drill.
       

      Hilong introduced UEPL with customized solutions of drilling fluid, directional drilling and bits in the 2nd half of 2015. After a number of technical exchanges and business trip to Hilong, UEPL released PO to Hilong to provide integrated service of well Rajani-5.

       

      Dai Daliang, senior vice president of Hilong Group and general manager of Oil Service Business said, “the Rajani-5 well is the first oversea integrated oil service project of Hilong, marking a big step forward on the part of Hilong towards becoming an integrated oil service supplier.”

      The Site of the Rajani-5 Well